Minutes, IBIS Quality Committee 06 January 2015 11:00-12:00 EST (08:00-09:00 PST) ROLL CALL Ericsson: Anders Ekholm Intel: Michael Mirmak IO Methodology * Lance Wang Signal Integrity Software * Mike LaBonte Teraspeed Labs: * Bob Ross Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- Mike LaBonte conducted the meeting. Call for opens and IBIS related patent disclosures: Opens: - Mike: Will there be an IBIS quality presentation at the DesignCon summit? - We might not have enough progress to show. - Bob: Agree, but we could have 2 slides to say we're still working on it. - Mike: That could be in the chair's presentation, if small enough. ARs: - Mike recover percent format specifications in spreadsheet. - Almost done, halfway through step 7. - Mike add comments to CMPNT, DLY, MSPEC sections. - No new progress. - Lance add comments to EBD section. - A spreadsheet was sent today. - Bob add comments to CIRCUIT section. - No new progress. IBISCHK message list comment additions: - Bob showed a spreadsheet sent by Lance. - Lance: Message 54 has been explained. - There is a similar addition for 73, but that says "Node" where it should be "Pin". - Mike: Should this be an ibischk BUG? - Bob: Node is a reserved word in EBD. - Lance: Actually it is a Node, the comment needs to be fixed. - Mike: The new comment is a useful addition because the message is not very helpful. IBISCHK message list cleanup: - Bob showed a new draft7 spreadsheet from Mike. - Mike: This is the result of the 7 step procedure we devised in the last meeting. - Bob: Why are there backslashes? - Mike: Excel added those to escape quotes within quotes. - They will be removed in the final output. - Bob: This will become our new reference once finished. - It can be posted into the ibischk601 directory. - Mike: It should be sent to Atul before he changes anything else. Summit presentation: - Bob showed the IBIS Quality presentation from the last SPI summit. - Mike: There will be be no ibischk5 documentation, just ibischk6. - We should show an example of what the final pages will look like. - Only one other slide should be needed. - Bob: We should have a presentation that we present ourselves. - It can be copied from the SPI PowerPoint. - Bob showed the ibischk5 and ibischk6 web pages. - Bob: The draft3 spreadsheet is there as well as a wip1 document example. - Mike: We could update the wip1, but probably shouldn't. - Bob: Agree. AR: Mike draft IQ presentation for DesignCon summit Meeting Schedule: - We agreed to meet Jan 13 and 20, not 27. - Bob might be unavailable Jan 20. Meeting ended: 11:56 Next meeting January 6